Bid Structuring

Package the scope.
Level what comes back.

Packages structured by trade, sent to subs, and returning bids lined up side by side so scope gaps show.

Bid packages and subcontractor leveling in the bid workspace

What it does

CSI-structured packages
Scoped by trade, generated together rather than assembled by hand for each one.
Invite subcontractors
Send ITBs with the documents attached, from your own directory or a radius search.
Level the bids
Side-by-side comparison with scope gaps, exclusions and alternates surfaced.

How it works

1
Generate the packages
Built from the project scope, divided by trade.
2
Invite and track
ITBs go out with the current document set attached.
3
Compare on equal terms
Bids lined up so you are comparing the same scope.

Questions

Where does the sub list come from?
Your own directory, imported or added manually, plus a radius search when you need coverage in an area you have not bid in before.
What does leveling actually show?
Each bid against the same scope, with what a sub excluded, what they added as an alternate, and where a package has no coverage at all.

Related features