Estimates built on the cost database you own — materials, labour, equipment and assemblies across 50 CSI divisions.
What it does
A database you control
Materials, labour, equipment and general conditions, maintained as master and custom libraries.
Assemblies and cost codes
Build the assemblies you actually use, and keep your own cost coding.
Conceptual or detailed
Historical area cost per square foot early on; full line-item detail once the takeoff is in.
How it works
1
Bring in the quantities
From the takeoff workspace or imported.
2
Apply your rates
Assemblies and cost codes from your own library.
3
Structure by CSI
Divisions 01–50, ready to roll into bid cost.
Questions
Do I have to use your cost data?
No. The database is yours — you can build it from your historical costs, and keep it private to your organisation. Benchmark data is available if you want a starting point.
Can I estimate before the takeoff is done?
Yes. Historical area cost per square foot gives an early conceptual number, which you replace with line-item detail as the takeoff progresses.