Proposal Writing

Writing a federal proposal that scores well

The proposal is graded against Section M, not against how good your company is. Write to the scoring, in the order the evaluator reads.

20 June 20267 min read

A federal proposal is not read for enjoyment. It is scored by someone with a matrix, working through factors in a fixed order, often across dozens of submissions. Everything below follows from that.

Write to Section M

Section M lists the evaluation factors and their relative importance. That is the mark scheme. If past performance is weighted above technical approach, your best writing belongs in past performance — not wherever you happen to have the most to say.

Mirror the government's own language and ordering. An evaluator looking for a factor should find it under the heading they expect, not inferred from a paragraph three sections earlier.

Answer the question that was asked

The commonest weakness is a proposal that describes the company instead of the work. “We have 30 years of experience” is not a technical approach. How you will sequence the work, staff it, protect the schedule and control quality on this project is.

Make compliance easy to verify

  • Follow Section L exactly: page limits, font, margins, file naming, forms.
  • Use a compliance matrix mapping every requirement to where you answered it.
  • Do not bury requirements in prose. If something is mandated, state it plainly.

Non-compliance is the cheapest way to lose. It costs an evaluator nothing to set a proposal aside for exceeding a page limit.

Past performance: relevant, recent, verifiable

Choose projects for similarity of scope, size and client type over impressiveness. Include contract number, value, dates and a reference who will actually answer the phone. An unverifiable reference is worth less than a smaller, checkable one.

Price and narrative should agree

If the narrative promises a crew size or a piece of equipment, the price should carry it. Evaluators notice when the technical volume describes work the price cannot fund.

Leave time for a compliance read

A final pass by someone who wrote none of it, reading only for Section L and M compliance, catches more lost points than another day of polishing. Schedule it before you schedule the writing.

Comments