Concrete estimates for concrete subcontractors, general contractors and civil builders. Volumes come from the structural sections rather than from plan area, rebar is weighed off the schedules, and formwork is priced by square foot of contact area with the reuse assumption written down.
Formwork and rebar are usually where a concrete bid is won or lost, so both are measured properly instead of carried as a percentage of the pour.
Everything below the slab, measured from the sections.
On grade and elevated, with the finishes that go with them.
Walls, columns and beams by section and height.
Rebar weighed off the schedules, not estimated per cubic yard.
Square feet of contact area with a stated reuse count.
Labor, pumping and the finish the spec actually calls for.
Three files, every time — the numbers, the evidence behind them, and what we assumed to get there.
A line-item estimate in Excel or CSV, priced off your own cost library or a regional benchmark database, with material, labor, equipment and subcontract split out.
The measured drawing set comes back with every quantity traced on the sheet it came from, so your own reviewer can check a number without re-measuring it.
A written basis of estimate: what was included, what was excluded, which allowances were carried, and the open questions worth issuing as an RFI before the bid goes out.
Output is organised by current CSI MasterFormat sections, and mapped to your own cost codes on request.
Upload the set through the request form. An estimator confirms scope and comes back with a fixed quote within four business hours.