Fire protection estimating software for sprinkler and fire alarm contractors. Heads counted by hazard classification and coverage area, pipe measured by size and system type, standpipes and pumps taken from the risers, and alarm devices counted from the plans — all priced against your own labor units.

Heads by hazard class Pipe by system NFPA-aware scope
Try the Free Analyzer Explore Features
Free Go/No-Go Analyzer · no card required · a specialist replies within 1 business day
What a fire protection estimate needs
Coverage, then pipe
Head count follows the hazard classification, and the hazard classification is in the specification
Head counts by hazard and coverage area
Pipe by size, system type and material
Standpipes, risers, valves and FDC
Fire pumps, tanks and controllers
Alarm devices, panels and wiring
What it is

The Hazard Classification Sets the Whole Bid

Fire protection is one of the few trades where the specification determines the quantity before anyone measures anything. The hazard classification — light, ordinary group 1 or 2, extra hazard — sets the design density, and the density sets the maximum coverage area per sprinkler head. Change the classification of a storage area and the head count in that area changes with it, along with the pipe sizes feeding it. An estimator who counts heads off a drawing without checking the classification against the specification is counting somebody else's design.

BidcoreAI reads the specification and the design criteria alongside the drawings. Head counts are derived from area and hazard classification where a layout is not yet drawn, and counted directly where it is, with the basis shown either way. Head types are separated — pendant, upright, sidewall, concealed, dry, extended coverage — because their costs and their installation times differ materially, and because a concealed head in a finished ceiling is a different job from an upright in a warehouse.

Pipe is measured by system and size: wet, dry, pre-action, deluge and antifreeze loops each carry their own material, fittings and labor. Risers, standpipes, control valve assemblies, inspector test connections, drains and fire department connections are counted as assemblies rather than reduced to feet of pipe. Fire pumps, jockey pumps, controllers and tanks are counted from the schedules with their power, structural and start-up interfaces noted.

The alarm side is estimated by device count — initiating devices, notification appliances, panels, annunciators and the wiring between them — with the interface to the electrical contractor stated explicitly. That interface is where fire protection scope most often falls between two bidders, and writing it down at estimate time is considerably cheaper than discovering it at the coordination meeting.

Scope

What the Software Takes Off on a Fire Protection Package

Sprinkler plans, riser diagrams, the fire alarm drawings and the design criteria in the specification.

Sprinkler Heads

Counted by type and derived by coverage where the layout is design-build.

  • Heads by type and temperature rating
  • Coverage area by hazard classification
  • Concealed, pendant, upright, sidewall
  • Escutcheons, guards and spare stock
Sprinkler Piping

Measured by system and size, with fittings, hangers and seismic bracing quantified.

  • Mains, cross mains and branch lines
  • Pipe by size, schedule and material
  • Fittings, couplings and hangers
  • Seismic bracing and sway restraints
Risers and Standpipes

Counted as assemblies rather than dissolved into linear feet of pipe.

  • Riser and control valve assemblies
  • Standpipes and hose valves
  • Inspector test and drain assemblies
  • Fire department connections
Pumps and Water Supply

Equipment from the schedules with the interfaces that come attached to it.

  • Fire pumps and jockey pumps
  • Controllers and transfer switches
  • Storage tanks and suction piping
  • Backflow prevention and metering
Fire Alarm

Devices counted from the alarm plans, with the electrical interface stated.

  • Initiating and notification devices
  • Panels, annunciators and power supplies
  • Wiring, conduit and pathway scope
  • Interface to electrical contractor
Testing and Special Systems

The end-of-job scope and the systems that fall outside a standard wet layout.

  • Hydrostatic testing and flushing
  • Clean agent and kitchen suppression
  • Pre-action and deluge systems
  • Inspection, commissioning and O&M
Features

Fire Protection Estimating Features

Design criteria, head counts and system types — carried as data, not held in the estimator's head.

AI Head Counting

Sprinkler heads recognised and counted by type across every level, reconciled against the legend and the design criteria.

Hazard Classification Aware

Design density and coverage area read from the specification, so head counts can be derived where the layout is design-build.

Pipe by System Type

Wet, dry, pre-action and deluge measured separately by size and material, since each carries its own labor and fittings.

Riser Assemblies

Control valve assemblies, test connections, drains and FDCs counted as assemblies rather than reduced to pipe length.

Hangers and Seismic Bracing

Support spacing by pipe size, with sway bracing quantified where the seismic design category requires it.

Pump and Tank Scope

Fire pumps, controllers and tanks counted from the schedules with their power, structural and start-up interfaces noted.

Fire Alarm Device Counts

Initiating devices, notification appliances, panels and wiring counted, with the electrical interface written down.

Labor Units by Head Type

Install hours per head, per fitting and per hundred feet of pipe from your own productivity, by ceiling condition.

Ceiling Condition Factors

Finished ceiling, open deck and rack storage each carry their own productivity, applied as visible factors.

Revision Comparison

A re-issued sprinkler or alarm plan compared against the last, so added devices are flagged rather than missed.

Excel Export

Head schedules, pipe by size, device counts and priced estimates exported with sheet references.

Material Summaries

Heads, pipe, fittings and hangers in order units, ready for a supplier or fabrication quote.

Spec coverage

Fire Protection Spec Coverage

Division 21 with the Division 28 alarm sections that are usually bid alongside it.

21 05 00Common work results for fire suppression
21 11 00Facility fire suppression water service piping
21 12 00Fire suppression standpipes
21 13 00Fire suppression sprinkler systems
21 21 00Carbon dioxide and clean agent systems
21 30 00Fire pumps
21 40 00Fire suppression water storage
28 31 00Fire detection and alarm
28 46 00Fire detection and alarm interfaces
Supported projects

Project Types It Is Built For

Warehouses, healthcare, high-rise, education and industrial — where hazard classification varies room to room.

Commercial Residential & multifamily Industrial Healthcare Educational Federal & government Retail Warehouse & distribution Hospitality Infrastructure & civil
Workflow

How a Fire Protection Estimate Comes Together

Read the criteria first. Everything downstream depends on it.

1
Upload the drawings and specification
Sprinkler plans, riser diagrams, fire alarm drawings, the Division 21 and 28 specification sections and any design criteria narrative.
2
Design criteria extracted
Hazard classifications, design densities and coverage requirements are read from the specification and mapped to the areas they apply to, with page citations.
3
Heads counted or derived
Where a layout is drawn, heads are counted by type. Where the work is design-build, counts are derived from area and coverage, with the basis shown on the line.
4
Piping measured by system
Mains, cross mains and branch lines measured by size and system type, with fittings, hangers and seismic bracing quantified from the same runs.
5
Assemblies and equipment counted
Riser and control valve assemblies, standpipes, test connections, FDCs, pumps, controllers and tanks counted with their interfaces noted.
6
Alarm scope counted
Initiating and notification devices, panels and wiring counted from the alarm plans, with the split against the electrical contractor written down explicitly.
7
Priced and delivered
Labor units applied by head type and ceiling condition, material from your supplier pricing, exported to Excel with the marked-up drawings behind it.
Benefits

What Changes on a Fire Protection Bid

Mostly, that the design basis is checked before the count is trusted.

Counts Tied to the Criteria

Deriving head counts from hazard classification catches the case where the drawn layout does not match the specification — before it becomes a rework item.

Ceiling Conditions Priced

A concealed head in a finished ceiling and an upright over racking are different installations. Applying separate productivity is what stops one subsidising the other.

Assemblies Not Dissolved

Riser and valve assemblies counted as assemblies means the labor that lives in them is priced instead of vanishing into feet of pipe.

The Alarm Interface Stated

Writing down what the electrical contractor is carrying is the cheapest possible way to avoid a gap in coverage at the coordination meeting.

Seismic Bracing Carried

Sway bracing quantified where the seismic category requires it rather than remembered during installation, when it is a change order.

Testing Included

Hydrostatic testing, flushing, inspection and commissioning are real hours, and counting them at bid is the only time it costs nothing.

Why BidcoreAI

Why Fire Protection Contractors Use BidcoreAI

Because the specification is part of the takeoff, not background reading.

Criteria read with the drawings

Hazard classifications and design densities are extracted with page citations and mapped to the areas they govern.

Heads by type

Pendant, concealed, upright, sidewall and dry heads counted separately, each with its own cost and install time.

Assemblies counted

Risers, control valves, test connections and FDCs priced as assemblies rather than reduced to pipe.

Alarm scope split written down

The interface with the electrical contractor is stated in the estimate, where it can still be negotiated.

Browser-based

No workstation licence; measure and price from anywhere.

Estimators available

Fire protection packages can be measured for you through MEP estimating services.

Frequently asked questions

Fire Protection Estimating Software — Your Questions Answered

It measures and prices a fire suppression package: sprinkler heads by type, piping by system and size, riser and standpipe assemblies, pumps and water supply, plus fire alarm devices where they are bid together. Crucially it reads the design criteria in the specification, because hazard classification determines head coverage and therefore the quantity.
Two ways, and the estimate shows which was used. Where a layout is drawn, heads are counted by type from the plans. Where the work is design-build, counts are derived from area and the maximum coverage per head allowed by the hazard classification in the specification. Counting a drawn layout without checking it against the criteria is how a bid ends up short.
It reads them from the specification — light hazard, ordinary group 1 and 2, extra hazard — and maps each to the areas it governs, with the page citation retained. Design density and coverage area follow from the classification, which is what makes derived head counts defensible.
Yes, as separate systems. Wet, dry, pre-action, deluge and antifreeze loops are measured independently because each carries different pipe material, fittings, valve assemblies and labor. A dry system in a parking garage is not a wet system priced with a different name.
Yes, and they are counted as assemblies rather than reduced to feet of pipe. Riser and control valve assemblies, standpipes, hose valves, inspector test connections, drains and fire department connections each carry their own material and labor content.
Yes. Initiating devices, notification appliances, panels, annunciators, power supplies and wiring are counted from the alarm drawings. The interface with the electrical contractor — who pulls which wire, who provides which conduit — is recorded explicitly in the estimate, because that boundary is where scope most often falls through.
Yes. Hanger spacing follows pipe size, and sway bracing and restraints are quantified where the seismic design category requires them. Bracing is easy to omit at bid and expensive to add during installation.
Yes. Install hours per head, per fitting and per hundred feet of pipe come from your own productivity history, with visible factors for ceiling condition — finished ceiling, open deck, rack storage — rather than a single blended rate.
Yes. Hydrostatic testing, flushing, inspection, commissioning support and O&M documentation are carried as their own lines. They are real hours, and the only time they cost nothing to include is before the bid goes in.
Yes. MEP estimating services cover fire protection, staffed by estimators working in this platform, returning head counts, pipe by system, assemblies, device counts and a priced estimate with the marked-up drawings behind it.
Would rather not measure it yourself?

Fire Protection and MEP Estimating Services

Send the sprinkler and alarm drawings with the specification, and have the package measured for you: heads by type checked against the hazard classification, pipe by system and size, riser assemblies, pumps and alarm devices — priced against your own labor units.

MEP Estimating Services See Work Samples
Related software

Estimating Software for Every Trade

One platform, one cost database, one set of drawings — whichever scope you are pricing today.

Get started

Check a Sprinkler Package Against Its Criteria

Bring a set where you know the head count. See whether the specification agrees with the drawing.

See Pricing Talk to Us