CSI Division 08 · Openings

Doors and Hardware Estimating Software From the Schedule

Door and hardware estimating software for door suppliers, installers and general contractors. Openings taken from the door schedule and reconciled against the plans, doors and frames priced by type and rating, and hardware priced by set — with schedule-versus-plan conflicts flagged before they become site problems.

Schedule reconciled Hardware sets priced Ratings tracked
Try the Free Analyzer Explore Features
Free Go/No-Go Analyzer · no card required · a specialist replies within 1 business day
What an openings estimate needs
Every opening, once
The door schedule and the floor plan rarely agree, and the difference is somebody's change order
Openings counted from schedule and plans
Doors by material, type, size and rating
Frames by material, profile and anchor type
Hardware priced by set, not by average
Conflicts between schedule and plan flagged
What it is

The Door Schedule Is a Bill of Materials That Disagrees With the Plans

Doors and hardware is the one package where the quantity is written down for you. The door schedule lists every opening with its number, size, material, type, rating, frame and hardware set. It should be the easiest takeoff in the building. In practice it is one of the most error-prone, because the schedule and the floor plans disagree on almost every project — an opening exists on the plan but not the schedule, a schedule row references a hardware set that was deleted two addenda ago, or a rated corridor has doors listed with no rating at all.

BidcoreAI reads the door schedule as structured data and reconciles it against the openings counted on the plans. Every mismatch is reported: openings on the plan with no schedule row, schedule rows with no opening, size and swing conflicts, and rated wall types with unrated doors in them. Each of those is either a takeoff correction or an RFI, and both are worth having before the bid rather than after award.

Pricing follows the schedule structure. Doors are priced by material, type, size, core, finish and rating — hollow metal, wood veneer, aluminium, glass, coiling, lead-lined. Frames are priced by material, profile, throat depth, anchor type and the wall condition they sit in. Hardware is priced by set, with the hardware schedule read set by set, rather than by an average hardware allowance per opening that is inevitably too high on the storerooms and too low on the exits.

The scope that surrounds an opening is carried too: access control interfaces and electrified hardware coordination, the framing and backing an opening requires, fire and smoke rating implications, and the installation labor, which varies substantially between a hollow metal frame set in masonry and a knock-down frame in an existing stud wall.

Scope

What the Software Takes Off on an Openings Package

Door schedule, hardware schedule, floor plans, wall types and the Division 08 specification.

Openings

Counted from the schedule and from the plans, then reconciled against each other.

  • Openings by number and location
  • Schedule versus plan conflicts
  • Size, swing and handing
  • Existing versus new openings
Doors

Priced by material, type and rating rather than as a single average per leaf.

  • Hollow metal, wood and aluminium
  • Glass, coiling and specialty doors
  • Cores, finishes and vision lites
  • Fire and smoke ratings
Frames

By material, profile and the wall condition they are installed in.

  • Welded and knock-down frames
  • Throat depth and profile
  • Anchor type by wall condition
  • Sidelites, transoms and borrowed lites
Hardware Sets

Priced set by set from the hardware schedule, not as an allowance per opening.

  • Hinges, locksets and closers
  • Exit devices and panic hardware
  • Thresholds, seals and sweeps
  • Set-by-set pricing and substitutions
Electrified Hardware

The access control interface, and the coordination scope that comes with it.

  • Electric strikes and mag locks
  • Card readers and REX devices
  • Power supplies and transfer hinges
  • Interface to electrical and security
Installation

Labor by frame type and wall condition, which vary more than the material does.

  • Frame setting by wall type
  • Door hanging and hardware fitting
  • Field modification and prep
  • Adjustment, keying and punch
Features

Doors and Hardware Estimating Features

Schedule reading, plan reconciliation and set-level hardware pricing.

Door Schedule Extraction

The schedule is read as structured data — number, size, material, rating, frame and hardware set on every row.

Plan Reconciliation

Openings counted on the plans are matched against schedule rows and every mismatch is reported as a correction or an RFI.

Rating Cross-Check

Door ratings checked against the rated wall types they sit in, which is the most common and most expensive schedule error.

Hardware Set Pricing

Hardware priced set by set from the hardware schedule rather than as an average allowance per opening.

Door Type Pricing

Material, core, finish, vision lites and specialty types priced individually rather than averaged into one leaf price.

Frame Conditions

Frame anchors and installation labor driven by the wall type each frame sits in — masonry, stud, existing.

Electrified Coordination

Electrified hardware flagged with its power, pathway and access-control interfaces, along with who is carrying them.

Addendum Tracking

A re-issued schedule is compared against the previous one, so changed sets and added openings are flagged automatically.

Installation Labor

Setting and hanging productivity by frame type and wall condition, from your own history.

Opening-by-Opening Output

A schedule-format export listing every opening with its door, frame, hardware set and price.

Keying and Cylinders

Keying scope, cylinders and core type carried as their own line rather than assumed inside the hardware set.

Excel Export

The complete openings schedule exported to Excel or CSV for the supplier, the submittal and the estimate.

Spec coverage

Openings Spec Coverage

Division 08, with the access control interface kept visible rather than assumed.

08 11 00Metal doors and frames
08 12 00Metal frames
08 14 00Wood doors
08 31 00Access doors and panels
08 33 00Coiling doors and grilles
08 41 00Entrances and storefronts
08 71 00Door hardware
08 71 13Automatic door operators
08 80 00Glazing
28 13 00Access control (interface)
Supported projects

Project Types It Is Built For

Healthcare, education, hospitality and commercial fit-outs — where the door schedule runs to hundreds of rows.

Commercial Residential & multifamily Industrial Healthcare Educational Federal & government Retail Warehouse & distribution Hospitality Infrastructure & civil
Workflow

How an Openings Estimate Comes Together

Read the schedule, count the plans, then argue with the difference.

1
Upload plans and schedules
Floor plans, the door schedule, the hardware schedule, frame details, wall types and the Division 08 specification sections.
2
Schedule extracted
The door schedule is read as structured data — number, size, material, type, rating, frame and hardware set for every row, with the sheet reference retained.
3
Openings counted on the plans
Openings are counted independently on the floor plans so the two sources can be compared rather than one being trusted.
4
Conflicts reported
Openings without schedule rows, rows without openings, size and swing mismatches, and unrated doors in rated walls are each reported for correction or RFI.
5
Doors and frames priced
Each opening prices by door material, type, core, finish and rating, and by frame material, profile and anchor type for the wall condition it sits in.
6
Hardware priced by set
The hardware schedule is priced set by set, with keying, cylinders and electrified components carried as their own lines and their interfaces noted.
7
Delivered as a schedule
The output is an opening-by-opening schedule in Excel with door, frame, hardware set and price on every row — usable for the bid and for the submittal.
Benefits

What Changes on an Openings Bid

The disagreement between the schedule and the plans becomes a document instead of a surprise.

Conflicts Found Early

Every project has openings the schedule missed. Finding them at bid time makes them an RFI; finding them later makes them a change order in someone else's favour.

Rating Errors Caught

Cross-checking door ratings against rated wall types catches the error that is cheapest to fix on paper and most expensive to fix after installation.

Hardware Priced by Set

An average allowance per opening is too high on storerooms and too low on exits. Set-level pricing removes both errors at once.

Installation Priced Honestly

A welded frame in masonry and a knock-down in an existing stud wall are different jobs. Frame condition drives the labor rather than a single per-opening rate.

Electrified Scope Coordinated

Flagging electrified hardware with its power and pathway interfaces settles who is carrying what before the coordination meeting does it for you.

One Output, Three Uses

An opening-by-opening schedule serves the estimate, the supplier quote and the submittal without being rebuilt each time.

Why BidcoreAI

Why Openings Estimators Use BidcoreAI

Because the schedule is data, and it should be treated as data.

Schedules read structurally

Every row parsed into its fields rather than eyeballed, so nothing is skipped in a 300-row schedule at midnight.

Reconciled against the plans

Two independent counts compared, with the differences reported instead of quietly resolved by whichever one you looked at last.

Set-level hardware

Priced from the hardware schedule set by set, with keying and cylinders carried separately.

Ratings cross-checked

Door ratings verified against the rated wall types they sit in, catching the error nobody wants to find on site.

Browser-based

Measure, reconcile and price from anywhere, with no workstation licence.

Estimators available

Openings packages can be measured for you through professional takeoff services.

Frequently asked questions

Doors & Hardware Estimating Software — Your Questions Answered

It reads the door and hardware schedules as structured data, counts the openings on the floor plans, reconciles the two, and prices each opening by door type, frame type and hardware set. The reconciliation is the valuable part: door schedules and floor plans disagree on almost every project, and that disagreement is where the money is.
Openings are counted independently on the plans and matched against the schedule rows. Openings with no schedule row, rows with no opening, and mismatches in size, swing or handing are each reported. Every item is then either a takeoff correction or an RFI, and both are far cheaper before the bid than after award.
Yes. Door ratings from the schedule are cross-checked against the rated wall types the openings sit in. An unrated door in a rated corridor is one of the most common schedule errors and among the most expensive to correct after installation.
Set by set from the hardware schedule, with each set priced from its actual components — hinges, locksets, closers, exit devices, thresholds, seals — rather than as an average allowance per opening. Averages are consistently too high on simple storeroom sets and too low on exit and access-controlled openings.
Yes. Electrified hardware is flagged with its power supply, pathway and access-control interfaces, and the estimate records which contractor is carrying each part. This boundary between the openings supplier, the electrician and the security contractor is a routine source of gaps.
Yes. Frame setting and door hanging productivity vary considerably by frame type and wall condition — a welded frame grouted into masonry is a different job from a knock-down frame in existing studs — and the labor follows the condition rather than a single per-opening rate.
The re-issued schedule is compared against the previous version and every change is flagged: added openings, deleted rows, changed hardware sets, revised ratings. On projects with several addenda this is usually the largest single source of estimating error, and comparison removes it.
Yes. The output is a schedule-format export listing every opening with its door, frame, hardware set and price, in Excel or CSV. The same file serves the estimate, the supplier quote and the basis of the submittal.
Yes. A general contractor uses it to carry the openings package in a whole-project estimate and to check supplier quotes against the schedule — particularly whether a quote priced the hardware sets as specified or substituted them.
Yes. Professional takeoff and estimating services are staffed by estimators working in this platform, returning a reconciled opening schedule, a conflict list and a priced estimate.
Would rather not measure it yourself?

Openings Takeoff and Estimating Services

Send the plans and the door and hardware schedules and have the package reconciled and priced for you — every opening matched between schedule and plan, conflicts listed, doors and frames priced by type, and hardware priced set by set.

Takeoff & Estimating Services See Work Samples
Related software

Estimating Software for Every Trade

One platform, one cost database, one set of drawings — whichever scope you are pricing today.

Get started

Reconcile a Door Schedule You Have Priced

Bring a schedule and a floor plan. The interesting part is how many openings do not appear on both.

See Pricing Talk to Us